Role-Power/UPF/formal Structural Checks(VCLP/Cadence conformal)
Type- Contract
Location- UK Remote
Daily Rate- As market standered.
Skills
- Understanding of Power Domains and its context with Logical vs Physical Design
- Low Power Special Cell (Isolation/LS etc)
- Power Reduction Techniques like Multi Voltage, Dynamic Frequency Scaling
- Creating power spec based on the design spec. Power intent development using UPF based on power spec
- Power intent validation at RTL level , Gate level (synthesis, PD ) using CLP
- Fixing power intent based on PA DV feedback for any issue related to power intent
- Debugging issues related to MV cell insertion during synthesis and modifying UPF accordingly
- Dynamic and Leakage power projection during starting of the project
- Dynamic and Leakage power no. generation using PTPX and tracking the same at different stages of implementation flow
- Highlighting issues related to dynamic and leakage power mismatch compared to the target and working with Synthesis and PD teams to fix the issues
- Working with cross function teams (SOC, Sub System etc) for smooth handoff of power intent and Dynamic & leakage power no. at different stages of project execution
- Working on low power verification using VLCP to check the consistency of UPF with respect to RTL/netlist.
- Run R2G and/or G2G equivalence checks and verify netlist consistency