EGL2 is a 2GW high voltage direct current (HVDC) electrical 'superhighway' cable link to be built between Peterhead in Aberdeenshire, Scotland and Drax in North Yorkshire, England.
The project is being jointly developed by Scottish and Southern Electricity Networks Transmission (SSENT) and our client.
The construction phase of the project is due to commence in July 2025, with intrusive surveys beginning October 2024.
Join Thames Water's bio recycling team as a manager responsible for the safe and efficient recycling of sewage sludge to agriculture.
Are you looking for a dynamic role that involves managing the safe and efficient recycling of sewage sludge for agriculture?
Build relationships with customers, landowners, and other communities, liaise with various organizations, and coordinate with the wider recycling team.
Our client, a leading utilities company, is currently seeking an Ecological Clerk of Works to join their team on a Fixed Term Contract basis.
This exciting opportunity will contribute to the construction phase of a high voltage direct current (HVDC) electrical project, set to commence in July 2025.
We are looking for a Flooding Improvement Process Electrical Technician (FLIP) to join Thames Water at Mogden, Sewage Treatment Works, permanently.
As a Successful candidate, you will be responsible for carrying out the planned and defect maintenance of FLIP (Flooding Improvement Process) devices throughout the Thames Water area.
You will inspect, fault diagnose and maintain devices fitted at properties, in a safe efficient, timely and effective manner with minimum supervision.
We have a great opportunity that is predominately a field-based role for a Technical Coordinator to join our North Home Counties pumping team based out Mill Green Sewage Treatment Works.
As the successful candidate you will be working as part of a close and supportive Field Operations team within Waste Pumping.
You will be focused on maintaining and improving pumping stations infrastructure, to ensure our assets operate 24/7.